How the power arrangements came to be as they are. The present arrangement is described in Battery, charging and power distribution.

The battery

A battery is required in case of mains power failure during a fire, and for routine diesel starting. The N26 6-FM-22 12 V 22 Ah battery supplied with the pump was replaced with a Fullriver HC44 battery, the N26 being moved to provide backup power in the house.

Getting charge to the shed

It was necessary either to run a 240 volt connection to the pump shed through an extension lead from the side deck or, more safely, to extend the charging wires from the charger in the house. An early plan used STP-2 16 AWG battery charging cable (1.291 mm copper, 13.2 ohm per 1000 m, so about 0.1 ohm over an 8 metre run), from AliExpress for $14.63, on the reasoning that the trickle charge from the 12 V Victron charger is typically 2-3 A, giving a trivial 0.3 V drop against the charger's 14.4-14.7 V.

The cable finally used is 10 AWG, sized for the charger's full 10 A and for the pump control module's battery connection: AWG 10 corresponds to a 2.05 mm (solid) or 2.5-3 mm (stranded) copper cable. 10 m of silicone-insulated 10 AWG two-core cable was available for $49.65, or 6 mm˛ (10 AWG) cut to length at $6.30 a metre (12 m = $75.60 plus $19.69 shipping, $95.29).

The cycle threshold

The original rule was to start, stop and restart the pump for intermittent spraying whenever the battery was above 12.25 V and the period off between cycles was at least 4 minutes (elsewhere 5 minutes), switching to valve recirculation below that. The present rules are in Battery, charging and power distribution.

<< Development history: sprinklers and pipework | | Development history: gel injection >>      |Table of Contents>


Page last modified on November 08, 2026, at 01:32 AM